Changing Techinal installations in 1. and 2. quadrant

We are changing over the techinal installations during our preperation for the construction of building 220 

Friday 28/3 until Sunday 30/3 2014

To minimise the inconvenience the changing over will be proceded during the weekend.

If you have any questions, please contact:
John Graversen: +45 24 29 49 29

Building 204, 205. 206 and 208
Closed for Chemestry discharge water
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 201, 204, 205, 206, 207 and 208
Closed for the compressed air
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 113, 114, 115, 118, 119, 201, 204, 205, 206, 207, 208, 221, 222, 223, 224, 227, 228
Closure of the DI-water
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 204, 221, 222, 223, 224, 227, 229
The cooler is swithed off
Saturday 03/29-14 from 7-12AM

Building 204, 205, 206, 207, 208, 210
The heating is turned off
From Saturday 03/29-14 at 7AM until Sunday 03/30-14 at 5PM

Building 208
The ventilation is switched off
Saturday 03/29-14 from 7AM until Sunday 03/30-14 at 5PM

Building 204, 205, 206, 207, 208
Water for domestic use is switched off. During this period all experiments and work are forbidden in the building since all the emergency showers are out of work.
Saturday 03/29-14 from 7Am-5PM

Building 207 and 208
All the toilets will be closed. There will be mobile toilets close to the buildings.
Saturday 03/29-14 from 7Am-5PM

TV Inspection in 3. Quadrant

Preperation for construction activity at 3. Quadrant.

THE WORK STARTS MONDAY 17/3 2014

We will start preparing for the coming construction activity and will start with a TV inspection and rinsing of the drains. The work itself won’t affect the daily use of the building, but it can smell.

  • If you experience a blocked toilet or drain, we kindly ask you to contact the person working at the specific drain – right outside the building, by their car or in your building.

The timeframe of the work are planned in to steps and planned finished in the fall 2014. A few days before the rinsing will start, there will be posted information in the buildings where you can read more about where and when the work take place.

If you have any questions, please contact:
Charlotte B. Lindberg: cbl@alectia.com
Thomas Holm: thp@alectia.com
Mikael Andersen: bmia@dtu.dk

Kemitorvet closes for parking

As of Friday, 14 March Kemitorvet will be closed for all parking. The entrance to building 210 from the north end of Kemitorvet is also closed. Stairs from Kemitorvet to Søltoft Space will be closed.

  • You can access to the building 210 via building 208 or through the glass hallway between buildings 227 and 210
  • You can park on Knuth-Winterfeldts Allé
  • See the map of 2. Quadrant

Building 220 Life Science – Sheet piling test changed to 14 oktober 2013

There are testing the sheet piling (spunsning) in between building 201 and 204 on Monday 14 October 2013. The test will go on all day.

  • There will be subtle vibration that will be felt in the surrounding buildings
  • Trafic on Henrik Dams Allé will be banned half of the day. It is possible to get to buildings on Kolonnevej from Nordvej
  • See updated map for 2. quadrant