Street Food Event

September 4th and September 5th from 11 AM – 2 PM

Come enjoy street food, coffee and music on the grass in the intersection of Anker Engelunds Vej og Knuth-Wintherfeldts Allé.

You can buy espresso coffee, danish rye bread sandwiches and 48 hour marinated kebab rolls.

The street food event celebrates the new semester and the redesign of the construction site fence for building 202, 205 and 220.

Transforming DTU Street Food IMG_4435.web.RGB IMG_4456.web.RGB OLYMPUS DIGITAL CAMERA

Changing Techinal installations in 1. and 2. quadrant

We are changing over the techinal installations during our preperation for the construction of building 220 

Friday 28/3 until Sunday 30/3 2014

To minimise the inconvenience the changing over will be proceded during the weekend.

If you have any questions, please contact:
John Graversen: +45 24 29 49 29

Building 204, 205. 206 and 208
Closed for Chemestry discharge water
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 201, 204, 205, 206, 207 and 208
Closed for the compressed air
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 113, 114, 115, 118, 119, 201, 204, 205, 206, 207, 208, 221, 222, 223, 224, 227, 228
Closure of the DI-water
From Friday 03/28-14, 3PM until Saturday 03/29, 3PM

Building 204, 221, 222, 223, 224, 227, 229
The cooler is swithed off
Saturday 03/29-14 from 7-12AM

Building 204, 205, 206, 207, 208, 210
The heating is turned off
From Saturday 03/29-14 at 7AM until Sunday 03/30-14 at 5PM

Building 208
The ventilation is switched off
Saturday 03/29-14 from 7AM until Sunday 03/30-14 at 5PM

Building 204, 205, 206, 207, 208
Water for domestic use is switched off. During this period all experiments and work are forbidden in the building since all the emergency showers are out of work.
Saturday 03/29-14 from 7Am-5PM

Building 207 and 208
All the toilets will be closed. There will be mobile toilets close to the buildings.
Saturday 03/29-14 from 7Am-5PM